Completed and Ongoing Projects


Major Electrical and Solar Projects

S.N

Work Description

Client Name

WO/PO. No. & Date

Order Value

Project Status

1

IEI and External

Electrification of GPOA Building CPWD, Naya Raipur,

CPWD (SBEC

Project Pvt. Ltd)

SBEC/RPR/GPA/WO- 15/20170719

Date-19/07/2017

Rs. 75088000

Completed

2

Construction of 10 MVA,

 

132/11 KV Substation ar Rail Wheel Plant, Bela

Rail Wheel Plant

 

Bela

P.O No.-01185148100324

 

Dated-24-10-2019

Rs. 86095190

Ongoing

3

Railway Signalling Cable, PVC insulated and sheathed 1.1 KV grade unscreened copper conductor high conductivity underground armoured

East Central Railway

51186070100017

 

Date- 31-JAN-19

Rs. 51994242

Completed

4

Internal and External Work, Gorakhpur (U.P)

Indian Railway (AMT-RSA

(JV))

Lucknow

2018/WP/GKP/LHB/Engg/ WT-

01 (Open)

 

Rs. 41934074

 

Ongoing

5

Operation & Maintenance of all

4x10 MVA, 132/33 KV

Substation

All HT & LT Equipment

Rail Wheel Plant

(Indian Railway),

 

Bela

LOA No.-Dy.CEE/RWP/

Elect. (Power)Operation/

 

OT/2018-19

Date- 19.09.2019

Rs. 14316881

Ongoing

6

Civil & Electrical work at

Dhanbad (JH)

Indian Oil

Corporation

W.O No.-BGE/CVL/BLII/

1920/WO

Date- 5/12/2019

Rs. 26840005

Ongoing

7

External Electrification

 

and 33/11 KV Substation

MPEB (PLM Builder

 

and Developers

Pvt. Ltd.)

PLM/Work order/2015-

 

43846

 

Date-11/07/2015

Rs. 39450000

Completed

8

External and Internal

Electrification for Rail Wheel Plant Bela

Indian Railway

RV/JEC/2012-13/08

 

Date-12/07/2015

Rs. 40116165

Completed

9

External Electrification

and Substation work of Park Green Colony

CSPDCL

EE/O&M/NR/WK-WO

 

Date- 13/04/2015

Rs. 36910621

Completed

10

Re-conducting/ Re-

Straightening of Existing HT and LT Line with allied work under state plan scheme in Samastipur

Circle

Jaguar

Overseas Limited

JOL/Samastipur/

Erection/8029 Date- 26/02/2019

Rs. 42500000

Ongoing

11

Construction of Double

Circuit 132 KV Line, 132/33 KV Substation

Aarti Sponge

and Power

 

Limited, Nandan Steels and Power Limited and Maruti Ferrous Pvt. Ltd.

ASPL/NSPL/MFPL/EHT

/WO/2019-20/01

 

Date-20/05/2019,

Rs. 66516669

Completed

12

Construction of 2000 KW

Solar Power Plant in PPP Mode at RWP, Bela, Danapur and Sonpur ( East Central Railway)

Indian

Railway

Dy.CEE/RWP/Elect/

SPV/01/OT

/2016-17/RFP, Dated-

09-03-18

EL/50/DNR/RFP/2016-

17,Dated-20/03/2017 L/29/Solar Plant 500 KWp Prov./HJP, Dated- 01/05/

2017

Rs. 130000000

Completed

13

External Electrification of

residential and Commercial Project

CSPDCL-

Swastik Group, Raipur

SG/RVS/2017-18/01-10

Rs. 85000000

Completed

14

External Electrification of

Residential Colony

CSPDCL-

Jay ambey project Ltd.

JAM/EE/2018-19/01

Rs. 16500000

Completed

15

Internal and External

Electrification Hospital and research centre, Raipur

Sankalp

Hospital

SHP/Elect/2017-18/02

Rs. 23200000

Completed

16

Electrification of Zone The Park Hotel

(4 Star Hotel)

 

Park Hotel

 

ZP/Elec/2015-16/011

 

Rs. 15500000

 

Completed

17

Electrification of CM Medical

College and Hospital, Durg (Chhattisgarh)

CM Medical College

CMMC-Infra-2016-17-33

Dated-20-7-2017

Rs. 22600000

Completed

18

Electrification Hotel Taj Gateway

at Raipur

Taj Gateway

Hotel

TGH-01985021

12th July 2015

Rs. 11000000

Completed

19

Exterrnal Electrification of

Residential Project at Chhidwada, Madhya Pradesh

MPEB

 

Rs. 22500000

Completed

20

Electrification of Plant of

TIMKEN India Ltd. Raipur (C.G)

TIMKEN India

Ltd.

 

 

Completed

21

Electrification & Substation work

of Shopping Malls at Chhattisgarh

Shopping Mall

BRIC/RVES/Elect/28

Rs. 21000000

Completed

22

External & External Electrification

of Steel Tube plant of Unit-V , APL Apollo Tubes Limited, Raipur

APL Apollo

Tubes Limited

PO- APL208000/02

Rs. 9000000

Completed

TOTAL VALUE

Rs. 779511608

Solar Projects

 

            Project Name

 

Project Capacity(in kwp)

 

         Nature  of Project

Academic Heights - Bemetra

100

SPV

Shiyalay Ispat — Urla

100

SPV

Real tepat — Urla

100

SPV

Drolia Electrosteels Pvt Ltd

200

SPV

Nikhil Agro Products.

50

SPV

Hitech Power & Steels Ltd

200

SPV

Crest Steel & Power - Rasmada

200

SPV

Allons Public School- Bemetra

100

SPV

Samadhan College - Bemetra

100

SPV

Gopal Sponge - Siltara

100

SPV

ViIlage-Basing,Dist-Narayanpur

3

Solar Pump

Atmbodh Agrawal

3

Solar Pump

Ganesh Yadav

3

Solar Pump

Praveen Agrawal

3

Solar Pump

Rajni Agrawal

3

Solar Pump

Gopal Singh

3

Solar Pump

Salim Javed

3

Solar Pump

Pravin Das Vaishnav

5

Solar Pump

Bedlal Sao

3

Solar Pump

Pooja Dubey

3

Solar Pump

Latika Sharma

3

Solar Pump

Naveen Lohan

3

Solar Pump

Sharadchand Agrawal

3

Solar Pump

Jagdishchand Sahu

3

Solar Pump

Manjusha Mishra

3

Solar Pump

Deepak Goud

3

Solar Pump

Shraddha Agrawal

3

Solar Pump

Santoshi Pansari

3

Solar Pump

Sushil Udyog

200

Solar Pump

Narsih Verma

3

Solar Pump

MagnetoMa! 1

100

SPV

Magneto Mall 2

100

SPV

Dist Hospital Ambikpaur

50

SPV

Collectorate Ambikapur

50

SPV

Dist Hospital Raigarh

50

SPV

Collectorate Raigarh

50

SPV

Bhilwara Pollster

35

SPV